Résumé
This document is a case study of the design and construction of a 30,000-sq m office tower that achieved an excellent energy-efficiency outcome close to the simulated potential, when modelled with actual weather data. The design features and processes contributing to the result were considered. Some of the lessons learnt throughout the simulation-and-result reconciliation work were articulated in order to promote the interchange of ideas and experiences among simulation practitioners. Differences between the simulated and actual results are also considered, and possible reasons were identified.
Documents disponibles
Format PDF
Pages : 30-37
Disponible
Prix public
20 €
Prix membre*
15 €
* meilleur tarif applicable selon le type d'adhésion (voir le détail des avantages des adhésions individuelles et collectives)
Détails
- Titre original : Closing the loop: office-tower simulation assumptions vs reality.
- Identifiant de la fiche : 30008353
- Langues : Anglais
- Source : EcoLibrium - vol. 11 - n. 7
- Date d'édition : 08/2012
Liens
Voir la source
Indexation
-
Comparaison et analyse appliquées à un système ...
- Auteurs : WANG L.
- Date : 04/2013
- Langues : Chinois
- Source : HV & AC - vol. 43 - n. 276
- Formats : PDF
Voir la fiche
-
Calibrated Simulation for Energy performance Ev...
- Auteurs : DHAKA S., PRAJAPATI H.
- Date : 10/2017
- Langues : Anglais
- Source : Air Conditioning and Refrigeration Journal - vol. 20 - n. 4
- Formats : PDF
Voir la fiche
-
Designing chilled water systems.
- Auteurs : SCHRECENGOST R.
- Date : 09/2014
- Langues : Anglais
- Source : Consulting-Specifying Engineer - vol. 51 - n. 8
Voir la fiche
-
SINGAPORE'S OUB CENTRE: TALLEST BUILDING IN THE...
- Auteurs : CARRICK A.
- Date : 1986
- Langues : Anglais
- Source : AIRAH J. - vol. 40 - n. 3
Voir la fiche
-
L'UTILISATION DE REFROIDISSEURS POUR CHALEUR SE...
- Auteurs : RAKOCZY T.
- Date : 1985
- Langues : Allemand
- Source : Klima Kälte Heiz. - vol. 13 - n. 3
Voir la fiche