Boucler la boucle : les a priori des simulations des tours de bureaux comparés à la réalité.

Closing the loop: office-tower simulation assumptions vs reality.

Auteurs : BINKS J., PTY E.

Type d'article : Article

Résumé

This document is a case study of the design and construction of a 30,000-sq m office tower that achieved an excellent energy-efficiency outcome close to the simulated potential, when modelled with actual weather data. The design features and processes contributing to the result were considered. Some of the lessons learnt throughout the simulation-and-result reconciliation work were articulated in order to promote the interchange of ideas and experiences among simulation practitioners. Differences between the simulated and actual results are also considered, and possible reasons were identified.

Documents disponibles

Format PDF

Pages : 30-37

Disponible

  • Prix public

    20 €

  • Prix membre*

    15 €

* meilleur tarif applicable selon le type d'adhésion (voir le détail des avantages des adhésions individuelles et collectives)

Détails

  • Titre original : Closing the loop: office-tower simulation assumptions vs reality.
  • Identifiant de la fiche : 30008353
  • Langues : Anglais
  • Source : EcoLibrium - vol. 11 - n. 7
  • Date d'édition : 08/2012

Liens


Voir la source