Document IIF
Durées des périodes de récupération après des essais sur la réponse thermique effectués sur des échangeurs de chaleur aux trous de forage verticaux.
Recovery times after thermal response tests on vertical borehole heat exchangers.
Numéro : pap. ID: 499
Auteurs : JAVED S., CLAESSON J., BEIER R. A.
Résumé
The design of a ground source heat pump system requires accurate knowledge of properties, such as ground thermal conductivity and borehole thermal resistance. These properties are often determined using an in-situ thermal response test of a pilot borehole. These tests are sometimes interrupted by unexpected circumstances and occasionally a retest is required. For a retest to be conducted, the ground temperature must return to within 0.1-0.3 K of the initial undisturbed ground temperature. This paper addresses the issue of borehole retesting and reports on a systematic series of thermal response tests conducted to study the times needed for the ground temperature to return to within 0.3 K of the pre-test ground temperature. Tests were conducted using various heat injection rates and different time durations. Following a test, the development of ground temperature was studied for up to 2-3 months. A mathematical model was used to validate the experimentally measured ground temperatures and to extend the results to other testing conditions.
Documents disponibles
Format PDF
Pages : 8 p.
Disponible
Prix public
20 €
Prix membre*
Gratuit
* meilleur tarif applicable selon le type d'adhésion (voir le détail des avantages des adhésions individuelles et collectives)
Détails
- Titre original : Recovery times after thermal response tests on vertical borehole heat exchangers.
- Identifiant de la fiche : 30003218
- Langues : Anglais
- Source : Proceedings of the 23rd IIR International Congress of Refrigeration: Prague, Czech Republic, August 21-26, 2011. Overarching theme: Refrigeration for Sustainable Development.
- Date d'édition : 21/08/2011
Liens
Voir d'autres communications du même compte rendu (569)
Voir le compte rendu de la conférence
Indexation
-
Ground-source heat pump with a 100-m deep boreh...
- Auteurs : SOLDO V., RUSEVLJAN M., CURKO T., et al.
- Date : 13/06/2010
- Langues : Anglais
- Source : IIR/Eurotherm sustainable refrigeration and heat pump technology conference. Proceedings of the Eurotherm Seminar No. 88, Stockholm, Sweden, June 13-16, 2010.
- Formats : PDF
Voir la fiche
-
Comparison of borehole heat exchangers response...
- Auteurs : FOSSA M., MINCHIO F.
- Date : 05/04/2011
- Langues : Anglais
- Source : Sources/sinks Alternative to the Outside Air for Heat Pump and Air-conditioning Techniques (Alternative Sources - AS), Padua, Italy, April 5-7, 2011. / International Sorption Heat Pump Conference (ISHPC11), Padua, Italy, April 6-8, 2011.
- Formats : PDF
Voir la fiche
-
Optimization of thermal performance in heat pum...
- Auteurs : BIALKO B., SANDLER S., KROLICKI Z., et al.
- Date : 16/08/2015
- Langues : Anglais
- Source : Proceedings of the 24th IIR International Congress of Refrigeration: Yokohama, Japan, August 16-22, 2015.
- Formats : PDF
Voir la fiche
-
Effets de la congélation du sol sur la performa...
- Auteurs : BAI T., ZHENG M., ZHANG J., et al.
- Date : 12/2009
- Langues : Chinois
- Source : HV & AC - vol. 39 - n. 232
- Formats : PDF
Voir la fiche
-
Heat dissipation effect on a borehole heat exch...
- Auteurs : DARKWA J., SU W., CHOW D. H. C.
- Date : 10/2013
- Langues : Anglais
- Source : Applied Thermal Engineering - vol. 60 - n. 1-2
Voir la fiche