Fonctionnement et gestion d'un système de conditionnement d'air efficace sur le plan énergétique, basé sur l'approvisionnement en air dans des projets souterrains.

[In Chinese. / En chinois.]

Auteurs : MIAO X., JIANG F., SUI L., et al.

Type d'article : Article

Résumé

An operation energy-consumption model for centralized air-conditioning systems is designed, based on the characteristics of the underground projects, and solution strategies are provided. Taking the supply air state in the air conditioned room as a connection point when solving the model, the model is divided into two phases : air supply and air handling, and solutions for both phases are provided which simplifies the calculation and produces the operation scheme with the lowest energy consumption, under the conditions of satisfying the environmental requirements in the air conditioned room.

Documents disponibles

Format PDF

Pages : 13-18

Disponible

  • Prix public

    20 €

  • Prix membre*

    15 €

* meilleur tarif applicable selon le type d'adhésion (voir le détail des avantages des adhésions individuelles et collectives)

Détails

  • Titre original : [In Chinese. / En chinois.]
  • Identifiant de la fiche : 30008493
  • Langues : Chinois
  • Source : HV & AC - vol. 42 - n. 268
  • Date d'édition : 09/2012

Liens


Voir d'autres articles du même numéro (7)
Voir la source