Optimisation de la performance des installations en toiture grâce à une stratégie de régulation de charge partielle.

Optimizing rooftop unit performance with part-load control strategies.

Auteurs : WOODCOCK R.

Type d'article : Article

Résumé

The specifying engineer should break with tradition and examine not just the maximum needs of the building, but the part-load capabilities that will be required more often than not. Sufficient capacity stages will help prevent excessive compressor cycling and more accurately maintain the desired leaving air temperature. With vav systems, the most common forms of capacity staging are compressor cycling and compressor cylinder unloading.

Détails

  • Titre original : Optimizing rooftop unit performance with part-load control strategies.
  • Identifiant de la fiche : 1999-3114
  • Langues : Anglais
  • Source : Air Cond. Heat. Refrig. News - vol. 206 - n. 12
  • Date d'édition : 22/03/1999
  • Document disponible en consultation à la bibliothèque du siège de l'IIF uniquement.

Liens


Voir la source