Document IIF

UN PROCEDE DE REALISATION EN UN SEUL POMPAGE D'UNE JONCTION TUNNEL JOSEPHSON NIOBIUM-SILICIUM-OXYDE DE SILICIUM-NIOBIUM.

ONE-PUMPDOWN-FABRICATED NIOBIUM-SILICON-SILICON DIOXIDE-NIOBIUM JOSEPHSON TUNNEL JUNCTIONS.

Auteurs : YOUBAO L.

Résumé

LES AUTEURS DECRIVENT UN NOUVEAU PROCEDE POUR REALISER LA MISE SOUS VIDE EN UNE SEULE FOIS D'UNE JONCTIONTUNNEL JOSEPHSON NIOBIUM-SILICIUM-OXYDE DE SILICIUM-NIOBIUM. CELLE-CI EST REALISEE SUR LE PRINCIPE DE STRUCTURE EN FENETRE FACE A FACE AVEC UNE DOUBLE COUCHE EN SURPLOMB. CES JONCTIONS SONT FIABLES EN RAISON DE LEUR ETANCHEITE COMPLETE ET SONT EXEMPTES D'ALTERATION ET DE CONTAMINATION. UNE TELLE JONCTION, SOUMISE A 30 CYCLES, ENTRE L'AMBIANCE ET 77 K OU 8 CYCLES ENTRE L'AMBIANCE ET 4,2 K ET IMMERGEE DANS L'EAU BOUILLANTE PENDANT 30 MINUTES, NE PRESENTE PAS DE DEGRADATION SENSIBLE. UN VIDE PLUS POUSSE ET DU NIOBIUM PLUS PUR FOURNISSAIENT UNE JONCTION AYANT DE MEILLEURES CARACTERISTIQUES.

Documents disponibles

Format PDF

Pages : 297-301

Document à numériser, disponible sous dix jours

  • Prix public

    20 €

  • Prix membre*

    Gratuit

* meilleur tarif applicable selon le type d'adhésion (voir le détail des avantages des adhésions individuelles et collectives)

Détails

  • Titre original : ONE-PUMPDOWN-FABRICATED NIOBIUM-SILICON-SILICON DIOXIDE-NIOBIUM JOSEPHSON TUNNEL JUNCTIONS.
  • Identifiant de la fiche : 1985-0934
  • Langues : Anglais
  • Source : [Refrigeration serving humanity]. Proceedings of the XVIth international Congress of Refrigeration.
  • Date d'édition : 07/08/1983
  • Document disponible en consultation à la bibliothèque du siège de l'IIF uniquement.

Liens


Voir d'autres communications du même compte rendu (541)
Voir le compte rendu de la conférence

Indexation