Résumé
The building is a shopping complex built as a Sino-Japanese joint venture investment. The paper presents the air-conditioning, ventilation and the smoke-management system design and the building. It emphasises the cooling and heating sources selection. Based on the environment and engineering characteristics. Two water cooled centrifugal chillers and four air cooled heat pump units used for heating in winter and cooling at partial loads in summer. The project has operated as well as expected by the designers since 1998.
Détails
- Titre original : [In Chinese. / En chinois.]
- Identifiant de la fiche : 2002-1444
- Langues : Chinois
- Source : HV & AC - vol. 31 - n. 141
- Date d'édition : 08/2001
- Document disponible en consultation à la bibliothèque du siège de l'IIF uniquement.
Liens
Voir d'autres articles du même numéro (13)
Voir la source
Indexation
-
Une PAC sur nappe phréatique pour climatiser un...
- Date : 04/2002
- Langues : Français
- Source : Chaud Froid Plomb. - n. 645
Voir la fiche
-
Il sistema ad anello d'acqua (WLHP): applicazio...
- Auteurs : VENCO M. S.
- Date : 09/1999
- Langues : Italien
- Source : Cond. Aria - vol. 43 - n. 9
Voir la fiche
-
Gas absorption cooling.
- Auteurs : WHITLEY K.
- Date : 03/2000
- Langues : Anglais
- Source : Build. Serv. J. - vol. 22 - n. 3
Voir la fiche
-
Un hypermarché a expérimenté le coulis de glace.
- Auteurs : HAËNTJENS H.
- Date : 10/2001
- Langues : Français
- Source : La revue pratique du froid et du conditionnement d'air - n. 897
Voir la fiche
-
Une surface de vente superlative.
- Auteurs : GRUMEL N.
- Date : 10/2000
- Langues : Français
- Source : La revue pratique du froid et du conditionnement d'air - n. 886
Voir la fiche