Principles and procedures of Total Building Commissioning (Cx) are presented as a case study of the U.S. District Courthouse, which is being constructed in Salt Lake City, Utah, USA, as a design-bid-build project. This 10-story building has a floor area of approximately 357,000 gross square feet (33,166 gross square meter) and has an estimated construction cost of $177 million. The construction is to be completed in July 2014. This case study focuses on commissioning of several systems during the design phase, and partial commissioning of the envelope system, which was the only system available for performance testing during the early stage of construction. Findings and conclusions are presented regarding performance enhancements of several systems attributable to commissioning during the design phase, and performance testing of the envelope system during the early construction stage.

Documents disponibles

Format PDF

Pages : 10 p.

Disponible

  • Prix public

    20 €

  • Prix membre*

    15 €

* meilleur tarif applicable selon le type d'adhésion (voir le détail des avantages des adhésions individuelles et collectives)

Détails

  • Titre original : Total building commissioning: case study of the U.S. District Courthouse in Salt Lake City, Utah, USA.
  • Identifiant de la fiche : 30009182
  • Langues : Anglais
  • Source : Clima 2013. 11th REHVA World Congress and 8th International Conference on Indoor Air Quality, Ventilation and Energy Conservation in Buildings.