De la conception jusqu'au fonctionnement : résultats obtenus grâce au nouveau contrat portant sur la performance des constructions neuves et au delà.

From design through operations: results from new construction performance contract and beyond.

Résumé

The primary objective of this research is to understand the performance targets and ongoing performance of two buildings that were the subject of a new construction performance contract. Secondary objectives include examining the building performance information systems developed as part of the new construction performance contract and evaluating the role of the energy management and control system as a data acquisition tool to provide recommendations for future new construction projects. The authors examine the results of the performance contract in detail, and provide additional performance metrics that go beyond what was required in the performance contract.

Détails

  • Titre original : From design through operations: results from new construction performance contract and beyond.
  • Identifiant de la fiche : 2006-2031
  • Langues : Anglais
  • Source : The AIVC CD.
  • Date d'édition : 08/04/2003

Liens


Voir d'autres communications du même compte rendu (7)
Voir le compte rendu de la conférence