Résumé

For the first time, a high temperature superconducting demonstration cable system has been installed in an utility network supplying electricity to consumers. The cable is installed in the network of Copenhagen Energy at a substation supplying approximately 50 000 customers. The purpose of the cable installation is to obtain installation and operating experience with this type of cable. The cable system has been in operation since May 28, 2001, and the first operating results have been satisfactory. The cable has been in operation for more than one year, and, during the first year, it has supplied 101 000 MWh of energy to customers.

Détails

  • Titre original : [In Japanese. / En japonais.]
  • Identifiant de la fiche : 2004-0494
  • Langues : Japonais
  • Source : Cryogenics/ Cryog. Eng. - vol. 37 - n. 9
  • Date d'édition : 2002
  • Document disponible en consultation à la bibliothèque du siège de l'IIF uniquement.