Contrat concernant la performance énergétique : évaluation technique du fonctionnement du conditionnement d'air à l'Hôpital d'Ipswich.
Energy performance contract: technical evaluation of air-conditioning operation and control at Ipswich Hospital.
Auteurs : BARRON H.
Type d'article : Article, Étude de cas
Résumé
The scope of works evaluated in the report involves heating ventilation and air-conditioning systems installed at Ipswich Hospital, Queensland. The works: upgraded the existing constant volume by-pass system to variable air volume system; installed variable speed drives on supply and return air fans; measure supply air quantities and re-balanced where necessary.
Détails
- Titre original : Energy performance contract: technical evaluation of air-conditioning operation and control at Ipswich Hospital.
- Identifiant de la fiche : 2008-1749
- Langues : Anglais
- Source : EcoLibrium - vol. 7 - n. 2
- Date d'édition : 03/2008
Liens
Voir la source
Indexation
-
Air change heat recovery ventilation brings ene...
- Auteurs : GOODWIN D.
- Date : 08/2007
- Langues : Anglais
- Source : Celsius - vol. 35 - n. 8
Voir la fiche
-
L'énergie solaire en Europe se développera si l...
- Date : 02/2005
- Langues : Français
- Source : Chaud Froid Plomb. - n. 676
Voir la fiche
-
Analyse en termes d'économies d'énergie d'un sy...
- Auteurs : LUO R., HUANG X., JIN G.
- Date : 06/2012
- Langues : Chinois
- Source : Refrigeration - vol. 31 - n. 2
Voir la fiche
-
Making the case.
- Auteurs : GOLDSTEIN E.
- Date : 2011
- Langues : Anglais
- Source : High Performing Buildings - Fall 2011
Voir la fiche
-
Harnessing climate.
- Auteurs : KUWABARA B., AUER T., AKERSTREAM T., et al.
- Date : 2011
- Langues : Anglais
- Source : High Performing Buildings - Fall 2011
Voir la fiche