Energy performance contract: technical evaluation of air-conditioning operation and control at Ipswich Hospital.
Author(s) : BARRON H.
Type of article: Article, Case study
Summary
The scope of works evaluated in the report involves heating ventilation and air-conditioning systems installed at Ipswich Hospital, Queensland. The works: upgraded the existing constant volume by-pass system to variable air volume system; installed variable speed drives on supply and return air fans; measure supply air quantities and re-balanced where necessary.
Details
- Original title: Energy performance contract: technical evaluation of air-conditioning operation and control at Ipswich Hospital.
- Record ID : 2008-1749
- Languages: English
- Source: EcoLibrium - vol. 7 - n. 2
- Publication date: 2008/03
Links
See the source
Indexing
-
Air change heat recovery ventilation brings ene...
- Author(s) : GOODWIN D.
- Date : 2007/08
- Languages : English
- Source: Celsius - vol. 35 - n. 8
View record
-
L'énergie solaire en Europe se développera si l...
- Date : 2005/02
- Languages : French
- Source: Chaud Froid Plomb. - n. 676
View record
-
La maîtrise de l'énergie dans les établissement...
- Date : 2007
- Languages : French
- Source: IEPF, Fiche tech. PRISME - n. 4
View record
-
The energy-saving analysis of a HVAC system wit...
- Author(s) : LUO R., HUANG X., JIN G.
- Date : 2012/06
- Languages : Chinese
- Source: Refrigeration - vol. 31 - n. 2
View record
-
Harnessing climate.
- Author(s) : KUWABARA B., AUER T., AKERSTREAM T., et al.
- Date : 2011
- Languages : English
- Source: High Performing Buildings - Fall 2011
View record