Energy performance contract: technical evaluation of air-conditioning operation and control at Ipswich Hospital.
Author(s) : BARRON H.
Type of article: Article, Case study
Summary
The scope of works evaluated in the report involves heating ventilation and air-conditioning systems installed at Ipswich Hospital, Queensland. The works: upgraded the existing constant volume by-pass system to variable air volume system; installed variable speed drives on supply and return air fans; measure supply air quantities and re-balanced where necessary.
Details
- Original title: Energy performance contract: technical evaluation of air-conditioning operation and control at Ipswich Hospital.
- Record ID : 2008-1749
- Languages: English
- Source: EcoLibrium - vol. 7 - n. 2
- Publication date: 2008/03
Links
See the source
Indexing
-
Progetto di riqualificazione del padiglione di ...
- Author(s) : FILORAMO F., GULOTTA F., ORLANDO P., et al.
- Date : 2009/10/08
- Languages : Italian
- Source: Impianti, energia e ambiente costruito: verso un benessere sostenibile. Atti 47° Congresso Internazionale AICARR: 8-9 ottobre 2009, Tivoli-Roma./ Systems, energy and built environment: toward a sustainable comfort. Proceedings 47th International Congress of AICARR: October 8-9, 2009, Tivoli-Rome.
- Formats : PDF
View record
-
Air change heat recovery ventilation brings ene...
- Author(s) : GOODWIN D.
- Date : 2007/08
- Languages : English
- Source: Celsius - vol. 35 - n. 8
View record
-
A hospital on the lake.
- Author(s) : LLOYD W.
- Date : 2001/06
- Languages : English
- Source: Consult. Specif. Eng. - vol. 29 - n. 6
View record
-
Outline and operation results of the Hiroo Metr...
- Author(s) : TAKAKUSA S.
- Date : 2008/01
- Languages : Japanese
- Source: Refrigeration - vol. 83 - n. 963
View record
-
Making the case.
- Author(s) : GOLDSTEIN E.
- Date : 2011
- Languages : English
- Source: High Performing Buildings - Fall 2011
View record