GUIDE FOR THE PROCESSES OF AIR CONDITIONING PLANT COMMISSIONING AND RECEPTION.
GUIDE DES OPERATIONS DE MISE EN SERVICE ET RECEPTION DES INSTALLATIONS DE GENIE CLIMATIQUE.
Type of article: Article
Details
- Original title: GUIDE DES OPERATIONS DE MISE EN SERVICE ET RECEPTION DES INSTALLATIONS DE GENIE CLIMATIQUE.
- Record ID : 1981-0375
- Languages: French
- Subject: Regulation
- Publication date: 1980/01
- Source: Source: Promoclim, A
vol. 11; n. 1; 27-30. - Document available for consultation in the library of the IIR headquarters only.
Indexing
- Themes: Regulations and standardization (Montreal and Kyoto Protocols…)
- Keywords: France; Process; Guide; Testing; Air conditioning
-
GUIDE DE LA NORMALISATION EN CLIMATIQUE.
- Date : 1987/03
- Languages : French
- Source: Promoclim, E - vol. 18 - n. 2
View record
-
GUIDE TECHNIQUE UEATC POUR L'AGREMENT DES FENET...
- Date : 1989/07
- Languages : French
- Source: Cah. CSTB - n. 301
View record
-
ENCEINTES A EMPOUSSIEREMENT CONTROLE. DEFINITIO...
- Date : 1983/03
- Languages : French
- Source: Norme fr. homol. AFNOR - NF X 44-102; 12 p.; 1 fig.
View record
-
Climate change: a guide to the processes involved.
- Author(s) : UNFCCC, CCNUCC
- Date : 2000/08
- Languages : English
View record
-
Manual of model procedures and guidance notes f...
- Author(s) : ITC UNCTAD-WTO
- Date : 2007/04
- Languages : English
View record