HVAC systems commissioning: aeraulics.
Il commissioning dei sistemi HVAC: l'aspetto aeraulico.
Author(s) : SANTOLI L. de
Type of article: Article
Summary
Commissioning is the process for ensuring that a specific system has been designed, installed, tested and is ready to work and be maintained in line with the design objectives. This is a topical issue, yet its terms and process stages are not always totally clear and known. The author explains the commissioning procedure, particularly focusing on tests and measures to check the quality of an air distribution system.
Details
- Original title: Il commissioning dei sistemi HVAC: l'aspetto aeraulico.
- Record ID : 2001-1514
- Languages: Italian
- Source: Cond. Aria - vol. 54 - n. 7
- Publication date: 2000/07
- Document available for consultation in the library of the IIR headquarters only.
Links
See the source
-
L'outil, clé de voûte du métier.
- Author(s) : SAPPA F.
- Date : 2001/10
- Languages : French
- Source: CLIM Prat. - n. 42
View record
-
Installation of data loggers.
- Author(s) : SELLERS D. A.
- Date : 2003/01
- Languages : English
- Source: HPAC Engineering - vol. 75 - n. 1
View record
-
Installation and commissioning of refrigeration...
- Date : 2003
- Languages : English
- Source: Action Energy, Good Pract. Guide - FPG347; 19 p.; fig.; tabl.
View record
-
Residential systems: being size wise.
- Author(s) : KURTZ B.
- Date : 2003/01
- Languages : English
- Source: ASHRAE Journal - vol. 45 - n. 1
View record
-
AIR CONDITIONERS. THEIR INSTALLATION AND LIMITS...
- Author(s) : PORTOSO D.
- Date : 1983
- Languages : Italian
- Source: Install. ital. - vol. 34 - n. 6
View record