Technical and sanitary quality of a plant: the case of a hospital.
Requisiti tecnici e igienici degli impianti: rischi biologici neglio ospedali.
Author(s) : BO M., RAPETTI M.
Type of article: Article, Case study
Details
- Original title: Requisiti tecnici e igienici degli impianti: rischi biologici neglio ospedali.
- Record ID : 2007-2250
- Languages: Italian
- Source: Cond. Aria - n. 1
- Publication date: 2007/01
Links
See other articles in this issue (17)
See the source
Indexing
- Themes: Comfort air conditioning
- Keywords: Ventilation; Hospital; Filtration; Case study; Italy; Air conditioning
-
Air conditioning Saifee Hospital & Research Cen...
- Author(s) : MURTHY S. K., NAIR S.
- Date : 2004/12
- Languages : English
- Source: Air Conditioning and Refrigeration Journal - vol. 7 - n. 4
- Formats : PDF
View record
-
The first Australian hospital with the H-series...
- Author(s) : GOODWIN D.
- Date : 2008/09
- Languages : English
- Source: Celsius - vol. 36 - n. 9
View record
-
Setting the standard.
- Author(s) : PEARSON A.
- Date : 2006/09
- Languages : English
- Source: Build. Serv. J. - vol. 28 - n. 9
View record
-
Klimatisieren im Bestand: Nachträgliche Install...
- Author(s) : OTTEN E.
- Date : 2009/03
- Languages : German
- Source: Kälte + Klimatechnik (Die) - vol. 62 - n. 3
View record
-
Volumi fuori e sottoterra.
- Author(s) : BASSI P.
- Date : 2007/03
- Languages : Italian
- Source: Cond. Aria - n. 3
View record