The cost of oversized plant.
Author(s) : BRITTAIN J.
Type of article: Article
Summary
It is generally accepted that most building services plants installed in the UK are oversized. The Building Services Research and Information Association (BSRIA) estimates that this oversizing can typically account for 10-15% of HVAC-related energy consumption. What can be done to solve the problem?
Details
- Original title: The cost of oversized plant.
- Record ID : 1998-1143
- Languages: English
- Source: Build. Serv. J. - vol. 19 - n. 4
- Publication date: 1997/04
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (3)
See the source
Indexing
- Themes: Air conditioning: general information
- Keywords: Economy; Fan; Power; Pump; Optimization; Equipment; Air conditioning
-
Application of univariate search methods to the...
- Author(s) : HANBY V. I., ANGELOV P. P.
- Date : 2000
- Languages : English
- Source: Build. Serv. Eng. Res. Technol. - vol. 21 - n. 3
View record
-
Konstruktive und systemtechnische Merkmale ener...
- Author(s) : HAIBEL M.
- Date : 1997/08
- Languages : German
- Source: KI Luft Kältetech. - vol. 33 - n. 8
View record
-
SELECTING THE OPTIMUM POWER FOR AN AIR CONDITIO...
- Author(s) : SOTNIKOV A. G., SABLOVSKIJ Ju. G.
- Date : 1987
- Languages : Russian
- Source: Kholodilnaya Tekhnika - n. 2
View record
-
Detection and diagnosis of HVAC faults via elec...
- Author(s) : SHAW S. R., NORFORD L. K., LUO D., et al.
- Date : 2002/01
- Languages : English
- Source: HVAC&R Research - vol. 8 - n. 1
View record
-
HVAC fans and smoke control.
- Author(s) : MECHAM M.
- Date : 2015/10
- Languages : English
- Source: Consulting-Specifying Engineer - vol. 52 - n. 9
View record