TROUBLE SHOOTING THE VAV SYSTEM.

Author(s) : MONGER S.

Type of article: Article

Summary

DISCUSSES HOW TO SET ABOUT MAXIMISING THE PERFORMANCE OF VARIABLE AIR VOLUME (VAV) SYSTEMS. DESCRIBES BRIEFLY THE SYSTEM AND ITS COMPONENTS AND DISCUSSES THE DESIGN OF THE SYSTEM AND ITS BALANCING. SETS OUT A BASIC PROCEDURE FOR CARRYING OUT BALANCING OF PRESSURE-INDEPENDENT SINGLE DUCT SYSTEMS. CONSIDERS IN TURN THE BALANCING AND ADJUSTMENT OF THE DISTRIBUTION SYSTEM AND THE PROPORTIONAL BALANCING OF THE OUTLETS. SETS OUT A TROUBLE SHOOTING GUIDE FOR VAV SYSTEMS. (INT. BUILD. SERV. ABSTR., GB., 25, N 1, 1990/01-02, 90-00108.

Details

  • Original title: TROUBLE SHOOTING THE VAV SYSTEM.
  • Record ID : 1990-2029
  • Languages: English
  • Publication date: 1989
  • Source: Source: Energy Eng.
    vol. 86; n. 6; 47-54.