UNIVERSITY HOSPITAL BLENDS NEW AND OLD.
Author(s) : HOLNESS G. V. R.
Type of article: Article
Summary
NEW TEACHING AND RESEARCH BUILDINGS HAVE VERY HIGH INSULATION STANDARDS, GIVING HEAT LOADS 22% LOWER THAN BEST MODERN PRACTICE. LARGE CHILLED WATER THERMAL STORAGE PERMITS 33% REDUCTION IN INSTALLED CHILLER CAPACITY PLUS STANDBY SECURIT VAV SYSTEMS WITH TERMINAL REHEAT BY CONDENSER WATER. VERY LOW OPERATING COSTS PREDICTED. A.R.T.
Details
- Original title: UNIVERSITY HOSPITAL BLENDS NEW AND OLD.
- Record ID : 1988-1170
- Languages: English
- Source: ASHRAE Journal - vol. 29 - n. 6
- Publication date: 1987
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (1)
See the source
Indexing
-
Themes:
Comfort air conditioning;
Chillers - Keywords: Ventilation; Chiller; Hospital; Air conditioning; Thermal energy storage
-
NEW YORK UNIVERSITY MEDICAL CENTER LINKS 6 CHIL...
- Author(s) : COPELAND C. C.
- Date : 1987
- Languages : English
- Source: ASHRAE Journal - vol. 29 - n. 6
View record
-
Herston Hospital complex: central energy plant.
- Author(s) : GLYNN D.
- Date : 2001/10
- Languages : English
- Source: AIRAH J. - vol. 55 - n. 10
View record
-
SOLAR AIR CONDITIONING OF A HOSPITAL IN NEW SOU...
- Author(s) : BUKAVS A.
- Date : 1984/02
- Languages : English
- Source: Aust. Refrig. Air Cond. Heat. - vol. 38 - n. 2
View record
-
The chilled water storage analysis for a univer...
- Author(s) : BOONNASA S., NAMPRAKAI P.
- Date : 2010/08
- Languages : English
- Source: Applied Thermal Engineering - vol. 30 - n. 11-12
View record
-
INTEGRATED STORAGE SYSTEMS.
- Author(s) : SETTY B.
- Date : 1981
- Languages : English
- Source: Heat. Pip. Air Cond. - vol. 53 - n. 7
View record