A case study: cost implications for HVAC commissioning.
Author(s) : SEELEN J., WOODS J. E., HARMON J. J.
Summary
Reports the findings of a case study where a heating, ventilation and air conditioning commissioning process was instituted during the pre-design phase of a new research facility. Evaluates the cost-effectiveness of the commissioning process and provides recommendations for future specifications.
Details
- Original title: A case study: cost implications for HVAC commissioning.
- Record ID : 1995-3080
- Languages: English
- Publication date: 1993/11
- Source: Source: Proc. IAQ '93, Phila.
97-100; 1 tabl.; ref. - Document available for consultation in the library of the IIR headquarters only.
Indexing
- Themes: Air conditioning: general information
- Keywords: Economy; Ventilation; Commissioning; Air conditioning; Heating
-
Specification of spreadsheet trend log sets for...
- Author(s) : SOLBERG D. P. W., TEETERS M. D.
- Date : 1992
- Languages : English
- Source: ASHRAE Transactions 1992. Part 2.
View record
-
Commissioning and fault detection of HVAC syste...
- Author(s) : GROB R. F., MADJIDI M.
- Date : 1997/08
- Languages : English
- Source: CLIMA 2000, Brussels 1997, August 30 to September 2, Congress Palace.
View record
-
Commissioning of air-conditioning system.
- Author(s) : GEORGES B., HU H., LEBRUN J.
- Date : 1997/08
- Languages : English
- Source: CLIMA 2000, Brussels 1997, August 30 to September 2, Congress Palace.
View record
-
RESEARCHES IN THE FIELD OF HEATING, VENTILATING...
- Author(s) : BOGOSLOVSKIJ V. N.
- Date : 1989/08/01
- Languages : English
View record
-
RECURSIVE ESTIMATION METHODS APPLIED TO A SINGL...
- Author(s) : LI X. M., WEPFER W. J.
- Date : 1987
- Languages : English
View record