A case study: cost implications for HVAC commissioning.
Author(s) : SEELEN J., WOODS J. E., HARMON J. J.
Summary
Reports the findings of a case study where a heating, ventilation and air conditioning commissioning process was instituted during the pre-design phase of a new research facility. Evaluates the cost-effectiveness of the commissioning process and provides recommendations for future specifications.
Details
- Original title: A case study: cost implications for HVAC commissioning.
- Record ID : 1995-3080
- Languages: English
- Publication date: 1993/11
- Source: Source: Proc. IAQ '93, Phila.
97-100; 1 tabl.; ref. - Document available for consultation in the library of the IIR headquarters only.
Indexing
- Themes: Air conditioning: general information
- Keywords: Economy; Ventilation; Commissioning; Air conditioning; Heating
-
Specification of spreadsheet trend log sets for...
- Author(s) : SOLBERG D. P. W., TEETERS M. D.
- Date : 1992
- Languages : English
- Source: ASHRAE Transactions 1992. Part 2.
View record
-
Spreadsheet application for HVAC operation cost...
- Author(s) : PHILLIPS J. N.
- Date : 1992
- Languages : English
- Source: J. Energy Eng. - vol. 89 - n. 1
View record
-
Hygiene in der Raumlufttechnik.
- Author(s) : HÄNDEL C.
- Date : 1997/12
- Languages : German
- Source: KI Luft Kältetech. - vol. 33 - n. 12
View record
-
Balancing ventilation systems: an annotated bib...
- Author(s) : AIVC, INIVE, LIMB M. J.
- Date : 2001
- Languages : English
View record
-
Refurbishment: the natural way.
- Author(s) : KENDRICK C., MARTIN A.
- Date : 1996/11
- Languages : English
- Source: Build. Serv. J. - vol. 18 - n. 11
View record