A guide to efficient laboratory ventilation.
Author(s) : KOENIGSBERG J.
Type of article: Article
Summary
The author presents: the process approach incorporating piping and instrumentation drawing documentation; possible alternatives as well as compact air handlers; the concept of using the sash to minimize hood exhaust demand called "Hand-operated positive energy control"; the use of enthalpy wheel and bifurcated fan as well as tunnel testing.
Details
- Original title: A guide to efficient laboratory ventilation.
- Record ID : 1999-3185
- Languages: English
- Source: Heat. Pip. Air Cond. - vol. 71 - n. 2
- Publication date: 1999/02
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (2)
See the source
Indexing
- Themes: Air conditioning in laboratories and industry
- Keywords: Laboratory; Ventilation; Recommendation; Guide; Air conditioning
-
Ventilation and air-conditioning system design ...
- Author(s) : LAI W. B.
- Date : 2007/06
- Languages : Chinese
- Source: Refrigeration - vol. 26 - n. 2
View record
-
Right-sizing laboratory HVAC systems. 1.
- Author(s) : MATHEW P., GREENBERG S., SARTOR D., et al.
- Date : 2005/09
- Languages : English
- Source: HPAC Engineering - vol. 77 - n. 9
View record
-
Large-scale laboratory ventilation.
- Author(s) : FRIER N., HOLMGREN H.
- Date : 1992/08
- Languages : Danish
- Source: TFVVS Danvak - vol. 28 - n. 9
View record
-
Ventilation strategy for laboratories: controll...
- Author(s) : MEMARZADEH F.
- Date : 2007/08
- Languages : English
- Source: HPAC Engineering - vol. 79 - n. 8
View record
-
AIR CONDITIONING AND VENTILATING PLANT FOR THE ...
- Author(s) : LESSIEUR P. D.
- Date : 1987/03
- Languages : Italian
- Source: Cond. Aria - vol. 31 - n. 3
View record