ADELAIDE STATION AND ENVIRONS REDEVELOPMENT.
Author(s) : HARRLAND P.
Type of article: Article
Summary
CONSTRUCTION OF NEW HOTEL, OFFICE AND CONFERENCE COMPLEX SPANNING 9 RAILWAY PLATFORMS REQUIRED SOLUTION OF ENVIRONMENTAL PROBLEM OF DIESEL FUME EXTRACT. CORROSION RESISTANT CANOPY EXTRACT HOODS DEVELOPED, HAVING 2-SPEED FANS AND PROGRAMMED BY TRACK SWITCHES AND SMOKE DETECTORS. AIR-CONDITIONING HAS 9,500 KILOW CAPACITY CENTRIFUGAL WATER CHILLERS AND FAN COIL UNITS WITH VAV IN OFFICES. CONFERENCE HALL HAS JET DIFFUSERS AND HIGH LEVEL EXTRACT. ENERGY MANAGEMENT SYSTEM FOR ALL BUILDING SERVICES. A.R.T.
Details
- Original title: ADELAIDE STATION AND ENVIRONS REDEVELOPMENT.
- Record ID : 1987-2349
- Languages: English
- Source: AIRAH J. - vol. 40 - n. 12
- Publication date: 1986
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (1)
See the source
Indexing
- Themes: Comfort air conditioning
- Keywords: High capacity; Ventilation; Rail transport; Air change; Hotel; Air conditioning
-
Le RER se met en frais.
- Author(s) : VRINAT G.
- Date : 2010/09
- Languages : French
- Source: Revue générale du Froid & du Conditionnement d'air - vol. 100 - n. 1106
View record
-
Research on energy saving control of ventilatio...
- Author(s) : ZHUANG W.
- Date : 2010/05
- Languages : Chinese
- Source: HV & AC - vol. 40 - n. 237
- Formats : PDF
View record
-
Confort climatique, des gares bien tempérées.
- Date : 2001/04
- Languages : French
- Source: Rail Rech. - n. 19
View record
-
Ventilation réfrigérée : un peu d'air frais pou...
- Author(s) : CARRIERE B.
- Date : 2000/11/22
- Languages : French
- Source: Vie Rail - n. 2772
View record
-
THE AIR CONDITIONING OF OFFICE BUILDINGS.
- Author(s) : FITZNER K.
- Date : 1985/10
- Languages : German
- Source: Kälte + Klimatechnik (Die) - vol. 38 - n. 10
View record