AIR CONDITIONING PLANT OF THE DANFOSS JAPAN BUSINESS CENTRE IN GOTENBA.
[In Japanese. / En japonais.]
Author(s) : DOI K.
Type of article: Article
Summary
DESCRIPTION OF A FULLY AUTOMATED AIR CONDITIONING PLANT SERVING A BUSINESS CENTRE. THE SYSTEM WAS DESIGNED TO PROVIDE THE MAXIMUM OF ENERGY SAVING BY USING WASTE HEAT FROM A NEARBY TEST FACILITY AND THE HEAT GENERATED BY AIR COMPRESSORS. SYSTEM COMPONENTS SUCH AS FANS AND PUMPS ARE CONTROLLED BY FREQUENCY CONVERTERS.
Details
- Original title: [In Japanese. / En japonais.]
- Record ID : 1989-0260
- Languages: Japanese
- Subject: Environment
- Source: Refrigeration - vol. 63 - n. 725
- Publication date: 1988
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (2)
See the source
Indexing
-
Themes:
Comfort air conditioning;
Green buildings - Keywords: Office; Building; Automation; Inverter; Heat recovery; Energy saving; Air conditioning
-
Saving energy in office buildings.
- Author(s) : HEIZER M.
- Date : 2003/05
- Languages : English
- Source: HPAC Engineering - vol. 75 - n. 5
View record
-
DOCKSIDE STYLE.
- Author(s) : ASHLEY S.
- Date : 1991/02
- Languages : English
- Source: J. chart. Inst. Build. Serv. - vol. 13 - n. 2
View record
-
Energy consumption indicator for office buildings.
- Date : 1995
- Languages : Dutch
- Source: ISSO - n. 37
View record
-
THERMAL BEHAVIOUR AND ENERGY PERFORMANCE OF ATR...
- Author(s) : HEJAZI-HASHEMI M. G.
- Date : 1989/08/01
- Languages : English
View record
-
OFFICE BUILDING WITH OPTIMIZED ENERGY CONSUMPTI...
- Date : 1982
- Languages : German
- Source: Sanit. Heiz.tech. - vol. 47 - n. 3
View record