Central air-conditioning in industry.

La climatisation par système centralisé dans l'industrie.

Type of article: Article

Summary

In central air conditioning, units treating various zones or premises are linked to a central cooling production and distribution system comprising several solutions: a "2-tube" solution comprising central production of chilled or hot water by a reversible unit; a "tubes and 2-wire" solution comprising central production and distribution of chilled water. Direct local electrical heating; a "4-tube" solution comprising central cooling and heating, along with distribution via chilled and hot-water networks. The author discusses these systems, along with constraints and applications limits of central production.

Details

  • Original title: La climatisation par système centralisé dans l'industrie.
  • Record ID : 1999-1104
  • Languages: French
  • Source: CLIM Prat. - n. 4
  • Publication date: 1997/07
  • Document available for consultation in the library of the IIR headquarters only.

Links


See other articles in this issue (3)
See the source