Central chilled water plant: balancing competing ESD (Electronic Speed Drive) challenges.
Author(s) : STANNUS W.
Type of article: Article
Summary
The central plant upgrade at the Victorian Arts Centre in Melbourne includes energy efficient design, including 12 000 kWr of new chilled water plant and associated infrastructure and controls.
Details
- Original title: Central chilled water plant: balancing competing ESD (Electronic Speed Drive) challenges.
- Record ID : 2003-1558
- Languages: English
- Source: EcoLibrium - vol. 1 - n. 11
- Publication date: 2002/12/01
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (1)
See the source
Indexing
- Themes: Air conditioning in laboratories and industry
- Keywords: Modernization; Design; Museum; Equipment; Energy saving; Air conditioning
-
Installatietechnische renovatie museum Catharij...
- Date : 1999/07
- Languages : Dutch
- Source: Koude Klim. - vol. 7 - n. 7-8
View record
-
RENOVATING THE HISTORIC REYNOLDA HOUSE MUSEUM.
- Author(s) : ROBINSON W. G. Jr
- Date : 1991/10
- Languages : English
- Source: ASHRAE Journal - vol. 33 - n. 10
View record
-
MODERNISATION DE L'INSTALLATION DE CONDITIONNEM...
- Author(s) : DIAZ J. M., CARRASCO J. A.
- Date : 1991/08/10
- Languages : French
- Source: New challenges in refrigeration. Proceedings of the XVIIIth International Congress of Refrigeration, August 10-17, 1991, Montreal, Quebec, Canada.
- Formats : PDF
View record
-
AIR CONDITIONING SYSTEMS IN HISTORICAL BUILDINGS.
- Author(s) : GIUSTI E., INNOCENTI R.
- Date : 1989/02
- Languages : Italian
- Source: Cond. Aria - vol. 33 - n. 2
View record
-
Air conditioning for the Rembrandt exhibition i...
- Author(s) : RIJNEN P. A.
- Date : 1992/05
- Languages : Dutch
- Source: Klimaatbeheersing - vol. 21 - n. 5
View record