COMMISSIONING OF VAV SYSTEMS IN BUILDINGS.

Type of article: Periodical article

Summary

COVERS THE COMMISSIONING REQUIREMENTS FOR VARIABLE AIR VOLUME (VAV) SYSTEMS IN AIR CONDITIONED BUILDINGS. STATES THE GUIDE IS INTENDED TO BE USED IN CONJUNCTION WITH THE CIBSE'S COMMISSIONING CODE, SERIES A < AIR DISTRIBUTION SYSTEMS >. IT IS ALSO COMPLEMENTARY TO AND HAS MANY FEATURES IN COMMON WITH BSRIA APPLICATION GUIDE 3/89 < THE COMMISSIONING OF AIR SYSTEMS IN BUILDINGS >. ORGANISES THE GUIDE IN 4 PARTS: 1) THE DESIGN OF COMMISSIONABLE SYSTEMS ; 2) THE INSTALLATION OF COMMISSIONABLE VAV SYSTEMS ; 3) VAV COMMISSIONING PROCEDURES ; 4) REPORTING AND DOCUMENTATION. (INT. BUILD. SERV. ABSTR., GB., 26, N 3, 1991/05-06, 91-00757.

Details

  • Original title: COMMISSIONING OF VAV SYSTEMS IN BUILDINGS.
  • Record ID : 1992-0736
  • Languages: English
  • Source: BSRIA, Appl. Guide - AG 1-91; 39 p.; 9 fig.; tabl.
  • Publication date: 1991
  • Document available for consultation in the library of the IIR headquarters only.

Links


See the source