COMMISSIONING OF VAV SYSTEMS IN BUILDINGS.

Type of article: Periodical article

Summary

COVERS THE COMMISSIONING REQUIREMENTS FOR VARIABLE AIR VOLUME (VAV) SYSTEMS IN AIR CONDITIONED BUILDINGS. THE SCOPE OF THE GUIDE INCLUDES THE CLOSELY-LINKED ASPECTS OF DESIGN AND INSTALLATION TO ENSURE THAT VAV SYSTEMS ARE COMMISSIONABLE. IT IS INTENDED TO BE USED IN CONJUNCTION WITH THE CIBSE COMMISSIONING CODE, SERIES A, < AIR DISTRIBUTION SYSTEMS >. IT IS ALSO COMPLEMENTARY TO THE BSRIA APPLICATION GUIDE 3/89. < THE COMMISSIONING OF AIR SYSTEMS IN BUILDINGS >. ORGANISES THE GUIDE IN 4 MAIN SECTIONS. THE DESIGN OF COMMISSIONABLE VAV SYSTEMS, THE INSTALLATION OF COMMISSIONABLE VAV SYSTEMS, VAV COMMISSIONING PROCEDURES, REPORTING AND DOCUMENTATION. (INT. BUILD. SERV. ABSTR., GB., 26, N 4, 1991/07-08, 91-01083.

Details

  • Original title: COMMISSIONING OF VAV SYSTEMS IN BUILDINGS.
  • Record ID : 1992-1297
  • Languages: English
  • Source: BSRIA - 40 p.; 18 fig.; GBP 30.00
  • Publication date: 1991
  • Document available for consultation in the library of the IIR headquarters only.

Links


See the source