Commissioning raised-floor plenums.
Author(s) : BEATY D.
Type of article: Article
Summary
While not well documented, testing raised-floor plenums is advisable but can be more difficult than testing ductwork.
Details
- Original title: Commissioning raised-floor plenums.
- Record ID : 2005-2205
- Languages: English
- Source: HPAC Engineering - vol. 77 - n. 1
- Publication date: 2005/01
Links
See other articles in this issue (1)
See the source
Indexing
-
Themes:
Other air-conditioning equipment;
Comfort air conditioning - Keywords: Floor; Ventilation; Process; Commissioning; Air conditioning; Distribution
-
Floor-supply displacement ventilation in a smal...
- Author(s) : KOBAYASHI N., CHEN Q.
- Date : 2003/08
- Languages : English
- Source: Indoor built Environ. - vol. 12 - n. 4
View record
-
Airflow dilemmas solved with an UFAD system.
- Author(s) : REES J. A.
- Date : 2006/03
- Languages : English
- Source: HPAC Engineering - vol. 78 - n. 3
View record
-
Ventilation rate requirements for raised floor ...
- Author(s) : LIU Y., HIRAOKA K.
- Date : 1997/10
- Languages : Japanese
- Source: Transaction of the Society of Heating, Air-conditioning and Sanitary Engineers of Japan - n. 67
View record
-
Design methods of air distribution in an underf...
- Author(s) : LIAN Z. W., WANG H. Y.
- Date : 2003/04/22
- Languages : English
- Source: Cryogenics and refrigeration. Proceedings of ICCR 2003.
View record
-
Experimental comparison of thermal environment ...
- Author(s) : CHAE Y. T., MOON H. J., et al.
- Date : 2004/09/05
- Languages : English
View record