Construction and testing of a novel absorption-recompression system.

Summary

The paper describes the development of a novel system based on the combination of a continuous absorption chiller with a vapour-recompression unit. A prototype system with a cooling capacity of 8 kW has been constructed and tested in the laboratory using the water-lithium bromide pair. Experimental results of the performance of the system were compared with predictions made using an in-house computer model.

Details

  • Original title: Construction and testing of a novel absorption-recompression system.
  • Record ID : 2000-1844
  • Languages: English
  • Source: CIBSE National Conference 1997. Proceedings.
  • Publication date: 1997/10/05
  • Document available for consultation in the library of the IIR headquarters only.

Links


See other articles from the proceedings (34)
See the conference proceedings