Design a turnkey floating LNG facility: important factors to consider when planning a FPSO (floating, production, storage and offloading vessel).

Author(s) : HARROLD D.

Type of article: Article

Details

  • Original title: Design a turnkey floating LNG facility: important factors to consider when planning a FPSO (floating, production, storage and offloading vessel).
  • Record ID : 2005-0021
  • Languages: English
  • Source: Hydrocarbon Processing - vol. 83 - n. 7
  • Publication date: 2004/07

Links


See other articles in this issue (2)
See the source