Design a turnkey floating LNG facility: important factors to consider when planning a FPSO (floating, production, storage and offloading vessel).
Author(s) : HARROLD D.
Type of article: Article
Details
- Original title: Design a turnkey floating LNG facility: important factors to consider when planning a FPSO (floating, production, storage and offloading vessel).
- Record ID : 2005-0021
- Languages: English
- Source: Hydrocarbon Processing - vol. 83 - n. 7
- Publication date: 2004/07
Links
See other articles in this issue (2)
See the source
Indexing
-
Themes:
LNG and LPG;
Applications of liquified gases - Keywords: Manufacture; Factory; Design; Recommendation; Production; LNG
-
Design advanced for large scale, economic, floa...
- Author(s) : NAKLIE M. M.
- Date : 1997/06/30
- Languages : English
- Source: Oil Gas J. - vol. 95 - n. 26
View record
-
Pour répondre à l'accroissement de la demande, ...
- Author(s) : BENDANI A., REKKAB O.
- Date : 1993
- Languages : French
- Source: Pét. Gaz arabes - vol. 25 - n. 577
View record
-
LPG-recovery processes for baseload LNG plants ...
- Author(s) : CHIU C. H.
- Date : 1997/11/24
- Languages : English
- Source: Oil Gas J. - vol. 95 - n. 47
View record
-
LNG: fuel of the future.
- Date : 1996
- Languages : English
- Source: Cold Facts - vol. 12 - n. 3
View record
-
LNG scheme proposed in British Columbia.
- Date : 1997/07/07
- Languages : English
- Source: Oil Gas J. - vol. 95 - n. 27
View record