Design and commissioning of pipework systems.
Author(s) : PARSLOE C., SPENCER A. W.
Type of article: Periodical article
Summary
Provides advices regarding the design of heating and chilled water systems, where heating or cooling circuits are serving mainly forced convection heating or cooling coils such as might be found in air handling units or fan assisted terminal units. Demonstrates the priorities for the design of such systems and indicates the effect of the commissioning process on the control of space conditions.
Details
- Original title: Design and commissioning of pipework systems.
- Record ID : 1998-0856
- Languages: English
- Source: BSRIA, Tech. Note - TN 20-95; 30 p.; 27 fig.; 2 tabl.; 18 ref.
- Publication date: 1995
Links
See the source
-
Application of control valves and balancing val...
- Author(s) : HEGBERG R. A.
- Date : 1998
- Languages : English
- Source: ASHRAE Transactions. 1998 Winter Meeting, San Francisco, CA.
View record
-
Pressure drop consideration of control valves.
- Author(s) : GOLESTAN F.
- Date : 1998
- Languages : English
- Source: ASHRAE Transactions. 1998 Winter Meeting, San Francisco, CA.
View record
-
Variable-primary-flow systems.
- Author(s) : SCHWEDLER M., BRADLEY B.
- Date : 2000/04
- Languages : English
- Source: HPAC Engineering - vol. 72 - n. 4
View record
-
The demise of the primary-secondary pumping par...
- Author(s) : KIRSNER W.
- Date : 1996/11
- Languages : English
- Source: Heat. Pip. Air Cond. - vol. 68 - n. 11
View record
-
Air conditioning water piping. Application Manual.
- Author(s) : AIRAH, MASON M., TRETHOWEN H. A., ARCHIBALD J.
- Date : 1993
- Languages : English
View record