Drilling: liaison with the authorities.
Démarches administratives sur le forage.
Author(s) : LENOTTE J. J., FOURNIER V.
Type of article: Article
Summary
The use of a ground-water source for a heat pump involves obtaining permission from several authorities in charge of ground and water resource management. In France, the geological risks involved in the use of a heat pump with ground-water source are covered by the Aquapac procedure.
Details
- Original title: Démarches administratives sur le forage.
- Record ID : 2001-2917
- Languages: French
- Source: Rev. gén. Froid - vol. 91 - n. 1013
- Publication date: 2001/05
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (4)
See the source
Indexing
-
Themes:
Comfort air conditioning;
Other heat-pump applications - Keywords: Regulations; France; Borehole; Heat pump; Air conditioning; Water-air; Underground water
-
Installation des pompes à chaleur sur eau de na...
- Author(s) : BERNIER J.
- Date : 2001/05
- Languages : French
- Source: Rev. gén. Froid - vol. 91 - n. 1013
View record
-
Mise en oeuvre d'une nappe souterraine.
- Author(s) : DESPLAN A., LAPLAIGE P.
- Date : 2001/05
- Languages : French
- Source: Rev. gén. Froid - vol. 91 - n. 1013
View record
-
Quando il freddo "moltiplica" il caldo.
- Author(s) : BACIGALUPO E. G.
- Date : 2000/10
- Languages : Italian
- Source: Cond. Aria - vol. 44 - n. 10
View record
-
Installation et suivi d'une pompe à chaleur sur...
- Author(s) : TALDIR J. M., LABRO P., BERT D.
- Date : 2000
- Languages : French
- Source: Qualita - n. 61
View record
-
The Commonwealth Building: ground-breaking hist...
- Author(s) : HATTEN M. J., MORRISON P. E., MORRISON W. B.
- Date : 1995/07
- Languages : English
- Source: ASHRAE Journal - vol. 37 - n. 7
View record