Summary
Taking the project as a study object, this article calculates the year-round 8760 hours cooling and heating loads of this building, and discusses the load-flow character of water system with two or more surface air handling units in parallel connection. Combined with water pump selecting and energy calculating software ESP-PLUS, it analyses the energy saving potential of variable frequency chilled/hot water pumps in the project, and obtains the minimal energy saving ratio of this measure.
Available documents
Format PDF
Pages: 131-137, 111
Available
Public price
20 €
Member price*
15 €
* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).
Details
- Original title: [In Chinese. / En chinois.]
- Record ID : 2008-2609
- Languages: Chinese
- Source: HV & AC - vol. 38 - n. 6
- Publication date: 2008/06
Links
See other articles in this issue (22)
See the source
Indexing
-
Design of air conditioning and ventilation syst...
- Author(s) : FANG Y.
- Date : 2011/11
- Languages : Chinese
- Source: HV & AC - vol. 41 - n. 257
- Formats : PDF
View record
-
Energy consumption status and energy efficiency...
- Author(s) : YANG W., SHI D., ZOU Y.
- Date : 2011/11
- Languages : Chinese
- Source: HV & AC - vol. 41 - n. 257
- Formats : PDF
View record
-
Air-conditioning system design for the Shanghai...
- Author(s) : ZHU X., ZHAO L., SHEN B.
- Date : 2008/06
- Languages : Chinese
- Source: HV & AC - vol. 38 - n. 6
- Formats : PDF
View record
-
Energy saving research for the Terminal 2 build...
- Author(s) : LU Y., HU Y., WEI D., et al.
- Date : 2008/06
- Languages : Chinese
- Source: HV & AC - vol. 38 - n. 6
- Formats : PDF
View record
-
Air conditioning system design of Wuxi Hongshan...
- Author(s) : WANG J., LAO Y.
- Date : 2011/10
- Languages : Chinese
- Source: HV & AC - vol. 41 - n. 255
- Formats : PDF
View record