Generation-capacity selection of the natural gas-fired CCHP system.

[In Chinese. / En chinois.]

Author(s) : ZHU F.

Type of article: Article

Summary

Conventional ways to determine the generation capacity are presented. According to the annual hourly load, generation capacity, with a project in Shijiazhuang using the two methods of fixing power based on cooling/heating load and fixing power based on electricity load, was obtained. The results show that the annual hourly load is important not only for determining the generation capacity, but also for forecasting the operating cost; appropriate power-on hours are the key to determine the generation capacity.

Available documents

Format PDF

Pages: 100-103

Available

  • Public price

    20 €

  • Member price*

    15 €

* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).

Details

  • Original title: [In Chinese. / En chinois.]
  • Record ID : 30008628
  • Languages: Chinese
  • Source: HV & AC - vol. 42 - n. 270
  • Publication date: 2012/10

Links


See other articles in this issue (2)
See the source