Indoor climatic performance analysis of a new air traffic centre: a case study in microclimate modelling.
Author(s) : ALAMDARI F., JACKMAN P. J., et al.
Summary
Refers to the New En Route Centre project on the South Coast which comprises a new air traffic control centre for the Civil Aviation Authority. Greater emphasis was put on indoor microclimate conditions within the operations room which is the heart of the Centre. Presents a case study which demonstrates the use of computation fluid-dynamics as a practical tool to foresee the likely consequences of design decisions before installation.
Details
- Original title: Indoor climatic performance analysis of a new air traffic centre: a case study in microclimate modelling.
- Record ID : 1995-3763
- Languages: English
- Publication date: 1994/04
- Source: Source: Proc. BEP 94, Univ. York
189-197; 8 fig.; 8 ref. - Document available for consultation in the library of the IIR headquarters only.
Indexing
- Themes: Comfort air conditioning
- Keywords: Design; Airport; Simulation; Control (generic); Air conditioning
-
Energy performance enhancement of Hong Kong Int...
- Author(s) : SUN Y., WANG S., CUI B., et al.
- Date : 2013/10
- Languages : English
- Source: Applied Thermal Engineering - vol. 60 - n. 1-2
View record
-
Computer modelling helps airport HVAC take off.
- Author(s) : POOL R. L., KAISRLIK D. L.
- Date : 1993/12
- Languages : English
- Source: Consult. Specif. Eng. - vol. 14 - n. 7
View record
-
HVAC design of the new terminal building in the...
- Author(s) : ZHOU J., PAN Q.
- Date : 2001/08
- Languages : Chinese
- Source: HV & AC - vol. 31 - n. 141
View record
-
Designing for climate control in large volumes.
- Author(s) : GUTHRIE A.
- Date : 1996/07
- Languages : English
View record
-
Comment climatiser une cathédrale de verre.
- Author(s) : SAGOT F.
- Date : 1997/07/18
- Languages : French
- Source: Moniteur - n. 4886
View record