Integrated building design including energy sources, building structure, HVAC and other technical systems. Case study of the Chapel on Bezanijska Kosa in Belgrade.
Integralno projektovanje zgrada ukljucujuci energetski izvor, gradevinsku strukturu, KGH i druge tehnicko-tehnoloske sisteme. Primer sabirne kapele na Bezanijskoj Kosi u Beogradu.
Author(s) : JOVANOVIC J., MICIC T., TODOROVIC M., et al.
Summary
The methodology and results of the performed multidisciplinary integrated building design of the Chapel on Bezanijska Kosa in New Belgrade is presented. The energy optimization of the building construction, of technical and HVAC systems as well as of the solar energy utilization and ground energy via heat pump has been conducted. The project is the result of the Agency for Building Land and Construction of Belgrade's decision to design and construct an efficient building from the point of energy efficiency, rational energy use and energy conservation, optimization of utilization of clean technologies and renewable energy sources, that means referential green buildings aimed at the demonstration and further dissemination.
Details
- Original title: Integralno projektovanje zgrada ukljucujuci energetski izvor, gradevinsku strukturu, KGH i druge tehnicko-tehnoloske sisteme. Primer sabirne kapele na Bezanijskoj Kosi u Beogradu.
- Record ID : 2006-0410
- Languages: Serbian
- Source: Toplotna energija u sadasnjim ekonomskim i ekoloskim uslovima. 33. Kongres o klimatizaciji, grejanju, hladenju. Zbornik radova.
- Publication date: 2002/12/04
Links
See other articles from the proceedings (10)
See the conference proceedings
Indexing
- Themes: Comfort air conditioning
- Keywords: Design; Yugoslavia; Heat pump; Case study; Solar energy; Religious building; Air conditioning
-
Indoor air quality in museums and historical bu...
- Author(s) : KORKIN V. D.
- Date : 1999/08/09
- Languages : English
View record
-
Appartementen Assen duurzaam verwarmd én gekoeld.
- Date : 2007/06
- Languages : Dutch
- Source: Koude & Luchtbehandeling - vol. 100 - n. 5
View record
-
Design of the air-conditioning system for an ap...
- Author(s) : LIN T., SUI X.
- Date : 2008/06
- Languages : Chinese
- Source: HV & AC - vol. 38 - n. 6
- Formats : PDF
View record
-
The Sistine Chapel: new HVAC system for cultura...
- Author(s) : GRABON M., ANDERSON J., BUSHNELL P., et al.
- Date : 2015/06
- Languages : English
- Source: ASHRAE Journal - vol. 57 - n. 6
View record
-
Primer paballón de deportes de España calentado...
- Date : 2005/05
- Languages : Spanish
- Source: Instalador - n. 419
View record