NEW HVAC SYSTEM IS BIG PART OF MAJOR HOTEL RENOVATION.
Author(s) : COHEN S.
Type of article: Article
Summary
WORK ON THE CHICAGO HILTON ENTAILED REDUCING THE NUMBER OF ROOMS FROM 2,200 TO 1,620 AND COMPLETELY UPDATING. IMPROVED INSULATION GIVES BETTER COMFORT USING EXISTING BOILER PLANT AND 10,400 KILOW CAPACITY CHILLERS. INDUCTION SYSTEM WAS REPLACED BY FAN COILS, LOCATED IN VERTICAL PIPE DUCTS. MANY UNIQUE PROBLEMS WERE SOLVED. CONTROL AND MONITORING BY NEW ENERGY MANAGEMENT SYSTEM. A.R.T.
Details
- Original title: NEW HVAC SYSTEM IS BIG PART OF MAJOR HOTEL RENOVATION.
- Record ID : 1988-1164
- Languages: English
- Source: Heat. Pip. Air Cond. - vol. 59 - n. 10
- Publication date: 1987/10
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (1)
See the source
Indexing
- Themes: Comfort air conditioning
- Keywords: Automation; Design; Hotel; Insulation; Control (generic); Air conditioning
-
WHAT'S BEING USED OUT THERE FOR SMOKE DETECTION...
- Author(s) : HOWELL T. A.
- Date : 1989
- Languages : English
View record
-
THE ILKA-VENTILATION AND AIR CONDITIONING EQUIP...
- Author(s) : KRENN J., SCHULZ D.
- Date : 1987
- Languages : German
View record
-
Combining DOAS and VRF. 1. Separating cooling/h...
- Author(s) : BOWERS G.
- Date : 2014/03
- Languages : English
- Source: HPAC Engineering - vol. 86 - n. 3
View record
-
Combining DOAS and VRF. 2. Separating cooling/h...
- Author(s) : BOWERS G.
- Date : 2014/04
- Languages : English
- Source: HPAC Engineering - vol. 86 - n. 4
View record
-
High-performance VAV systems.
- Author(s) : MURPHY J.
- Date : 2011/10
- Languages : English
- Source: ASHRAE Journal - vol.53 - n. 10
View record