Optimizing configuring and running-mode of solar energy and ground-source heat pump hybrid systems.

[In Chinese. / En chinois.]

Author(s) : FENG X., ZHANG X., ZOU Y., et al.

Type of article: Article

Summary

The article concludes that the solar energy system should be prior to the ground-source heat pump system in operation, the utilization of solar energy resource should be the way according to the energy grade, a possibly larger solar collector area is good for direct utilization of solar energy, and the solar collector cost of 250 RMB per square meter is appropriate.

Available documents

Format PDF

Pages: 79-83

Available

  • Public price

    20 €

  • Member price*

    15 €

* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).

Details

  • Original title: [In Chinese. / En chinois.]
  • Record ID : 30004018
  • Languages: Chinese
  • Source: HV & AC - vol. 41 - n. 258
  • Publication date: 2011/12

Links


See other articles in this issue (8)
See the source