PIPING: PROBLEMS ASSOCIATED WITH PIPEWORK IN MULTI-STOREY BUILDINGS.
Author(s) : WILLIAMS C.
Type of article: Article
Summary
HIGH PIPE STATIC PRESSURES IN TALL BUILDINGS WILL REQUIRE SPECIAL ATTENTION TO MATERIALS, FITTINGS, JOINTING METHODS AND TESTING. WATER FLOODING CAN BE VERY COSTLY. LONG VERTICAL RUNS REQUIRE FIRM SUPPORT AND PROVISION FOR EXPANSION ON BOTH RUNS AND BRANCHES. FIRE SEALING IS USUALLY NECESSARY. CHECK LISTS AND CASE HISTORIES. A.R.T.
Details
- Original title: PIPING: PROBLEMS ASSOCIATED WITH PIPEWORK IN MULTI-STOREY BUILDINGS.
- Record ID : 1991-1719
- Languages: English
- Source: AIRAH J. - vol. 44 - n. 9
- Publication date: 1990/09
Links
See other articles in this issue (1)
See the source
Indexing
- Themes: Other air-conditioning equipment
- Keywords: Automation; Piping; Design; Automatic valve; Performance; Air conditioning; Water
-
Les limites d'un dimensionnement trop précis de...
- Author(s) : DIDIER G.
- Date : 1998/09
- Languages : French
- Source: Chaud Froid Plomb. - n. 605
View record
-
Air conditioning water piping. Application Manual.
- Author(s) : AIRAH, MASON M., TRETHOWEN H. A., ARCHIBALD J.
- Date : 1993
- Languages : English
View record
-
A two- or three-way system?
- Author(s) : WESSELINGH N.
- Date : 1994/03
- Languages : Dutch
- Source: Koude Mag. - n. 3
View record
-
Pressure drop consideration of control valves.
- Author(s) : GOLESTAN F.
- Date : 1998
- Languages : English
- Source: ASHRAE Transactions. 1998 Winter Meeting, San Francisco, CA.
View record
-
Faut-il installer un robinet d'équilibrage sur ...
- Author(s) : COURTIN P.
- Date : 1999/01
- Languages : French
- Source: Chaud Froid Plomb. - n. 609
View record