Rehabbing office buildings.

Author(s) : MCGUIRE A. B.

Type of article: Article

Summary

Cost-effective refurbishment of existing HVAC systems, some of which may be 40 years old, requires an understanding of the original design. It may be possible to use serviceable plant for an improved system. Advice is given on the conversion of reheat, dual duct, multizone, induction and other systems. Newer plant may have insufficient fresh air supply to meet indoor air quality standards. Piping may need replacement. An overall strategy must be planned. A.R.T.

Details

  • Original title: Rehabbing office buildings.
  • Record ID : 1993-3508
  • Languages: English
  • Source: Heat. Pip. Air Cond. - vol. 65 - n. 3
  • Publication date: 1993/03
  • Document available for consultation in the library of the IIR headquarters only.

Links


See other articles in this issue (4)
See the source