Renovating the Pentagon's heating and refrigeration plant.
Author(s) : SNYDER G. C. Jr
Type of article: Article
Summary
A 10-year refurbishment plan for the Washington military centre includes renovation, without interrupting the service, of the HVAC systems, many parts of which have been working for 50 years. New concentric ring mains for chilled and hot water, and steam, will be supplied from old and new plant rooms until the scheme is complete. Planned extension to 98.6 megawatt chiller capacity. A.R.T.
Details
- Original title: Renovating the Pentagon's heating and refrigeration plant.
- Record ID : 1993-1511
- Languages: English
- Source: ASHRAE Journal - vol. 34 - n. 7
- Publication date: 1992/07
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (3)
See the source
Indexing
-
Themes:
Other air-conditioning equipment;
District cooling - Keywords: Modernization; District cooling; USA; Air conditioning; District heating
-
Proposed renovation of a district cooling plant...
- Author(s) : TREDINNICK S. M.
- Date : 1998
- Languages : English
- Source: ASHRAE Transactions. 1998 annual Meeting, Toronto, Ontario + CD-ROM.
View record
-
Thermal ventures boosts cooling load with satel...
- Author(s) : BEES J.
- Date : 1998
- Languages : English
- Source: Dist. Energy - vol. 83 - n. 3
View record
-
Washington district heating and cooling at work.
- Date : 1993
- Languages : English
- Source: Dist. Heat. Cool. - vol. 79 - n. 2
View record
-
Potentiality of decentralized system utilizing ...
- Author(s) : TOMONAGA J., KOKADO S.
- Date : 1999/03
- Languages : Japanese
- Source: Refrigeration - vol. 74 - n. 857
View record
-
DISTRICT HEATING AND COOLING WITH HEAT PUMPS OU...
- Author(s) : CALM J. M.
- Date : 1988
- Languages : English
View record