Technical challenges during the engineering phases of the Qatargas II large LNG trains.

Author(s) : CHAVEZ V., WRIGHT S., MARZOOQI M. al, et al.

Summary

This paper describes some of the technical challenges encountered during the engineering phases of the Qatargas II LNG onshore development facility, which is being developed as a joint venture between Qatar Petroleum and ExxonMobil. It describes the measures taken to overcome these technology changes, including the first application of the Air Products AP-XTM LNG technology. It also reviews the human factor challenges inherent in the increase in facility scale and the solutions implemented in the detailed design phase.

Details

  • Original title: Technical challenges during the engineering phases of the Qatargas II large LNG trains.
  • Record ID : 2008-1130
  • Languages: English
  • Source: LNG 15. Proceedings of the 15th International Conference and Exhibition of Liquefied Natural Gas.
  • Publication date: 2007/04/24

Links


See other articles from the proceedings (43)
See the conference proceedings