Thermal economic analysis on CCHP system based on microturbines.

[In Chinese. / En chinois.]

Author(s) : YANG W., GUO K.

Type of article: Article

Summary

Based on the analysis of the system cost construction, the article calculates the equipment investment cost, running cost and fuel cost with the thermo-economic factor evaluation model, and analyses the influences of equipment investment cost, fuel cost and running time on the thermo-economic factor of the system. The results show that the fuel cost and the running time have important influences on the thermo-economic factor, and decreasing the unit fuel price and increasing the running time can reduce the thermo-economic factor of the system.

Available documents

Format PDF

Pages: 80-83

Available

  • Public price

    20 €

  • Member price*

    15 €

* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).

Details

  • Original title: [In Chinese. / En chinois.]
  • Record ID : 30005234
  • Languages: Chinese
  • Source: HV & AC - vol. 42 - n. 259
  • Publication date: 2012/01

Links


See other articles in this issue (7)
See the source