UNIT AIR CONDITIONING. GUIDE TO GOOD PRACTICE.

Type of article: Periodical article

Summary

THE GUIDE COVERS THE SELECTION, INSTALLATION, COMMISSIONING AND MAINTENANCE OF SYSTEMS INCORPORATING UNIT AIR CONDITIONERS OR HEAT PUMPS, OF THE VAPOUR COMPRESSION TYPE. THE RECOMMENDATIONS IN THIS GUIDE APPLY TO SYSTEMS WITH CAPACITIES UP TO 70 KW. THE CONTENTS IS AS FOLLOWS: DESIGN CONDITIONS. THE AIR CONDITIONING UNIT. SYSTEM CONTROLS. SYSTEM PROTECTION AND SAFETY DEVICES. WATER COOLING. CONDENSATE DISPOSAL. REFRIGERANT PIPEWORK. VALVES. HUMIDIFICATION. ELECTRICAL EQUIPMENT AND WIRING. DUCTWORK, GRILLES AND DIFFUSERS. AIR FILTERS. TESTING OF REFRIGERANT PIPEWORK. COMMISSIONING. MAINTENANCE. APPENDICES: GLOSSARY; OUTSIDE DESIGN TEMPERATURE; STATUTES, STANDARDS, AND REGULATIONS.

Details

  • Original title: UNIT AIR CONDITIONING. GUIDE TO GOOD PRACTICE.
  • Record ID : 1981-0217
  • Languages: English
  • Source: Heat. Vent. Contract. Assoc. - 19 p.; fig.; 1 tabl.; 3 append.
  • Publication date: 1980/05
  • Document available for consultation in the library of the IIR headquarters only.

Links


See the source