Summary
The commissioning process (CxP) has been used by many owners to achieve quality in buildings and processes. ASHRAE has developed a general guide for implementing the CxP and NIBS is developing a complete CxP for buildings. CxP provides a new means for delivery of buildings, air-conditioning and refrigeration. A key emphasis of the CxP is orientation to owners needs a continuous improvement of the planning-design-construction-acceptance-operation of refrigeration, central power/heat plant and air-conditioning systems.
Available documents
Format PDF
Available
Public price
20 €
Member price*
Free
* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).
Details
- Original title: What does the commissioning process accomplish?
- Record ID : 2000-1265
- Languages: English
- Source: 20th International Congress of Refrigeration: Refrigeration into the Third Millennium.
- Publication date: 1999/09/19
Links
See other articles from the proceedings (447)
See the conference proceedings
Indexing
-
Impatto ambientale di impianti di refrigerazion...
- Author(s) : GRIPPO C., SACCHI A.
- Date : 2001/06/29
- Languages : Italian
- Source: Le ultime tecnologie del freddo e del condizionamento./ Latest technologies in refrigeration and air conditioning.
View record
-
New technologies in refrigeration and air condi...
- Author(s) : LUCAS L.
- Date : 2001/06/29
- Languages : English
- Source: Le ultime tecnologie del freddo e del condizionamento./ Latest technologies in refrigeration and air conditioning.
View record
-
Commissioning and fault detection of HVAC syste...
- Author(s) : GROB R. F., MADJIDI M.
- Date : 1997/08
- Languages : English
- Source: CLIMA 2000, Brussels 1997, August 30 to September 2, Congress Palace.
View record
-
Design considerations of control valve flow cha...
- Author(s) : DU J., ERICKSON B., BURWELL, DICKINSON B.
- Date : 1997
- Languages : English
- Source: International Symposium on Air Conditioning in High Rise Buildings - 1997
- Formats : PDF
View record
-
Commissioning of air-conditioning system.
- Author(s) : GEORGES B., HU H., LEBRUN J.
- Date : 1997/08
- Languages : English
- Source: CLIMA 2000, Brussels 1997, August 30 to September 2, Congress Palace.
View record