Summary
As one of the few buildings nearly 600 metres in height, for lack of experiences and technical information in similar projects, designers from different disciplines have encountered challenge to some extent. Presents the relationship between height and air conditioning load, pressure zones determination , network computer room air conditioning system design, back-up chilled water pipes setting, and supply and exhaust air distribution for cooling towers, expounds problems that should be concerned and solved in the high-rise building design.
Available documents
Format PDF
Pages: 60-63
Available
Public price
20 €
Member price*
15 €
* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).
Details
- Original title: [In Chinese. / En chinois.]
- Record ID : 30009410
- Languages: Chinese
- Subject: Environment
- Source: HV & AC - vol. 42 - n. 272
- Publication date: 2012/12
Links
See other articles in this issue (6)
See the source
Indexing
-
Themes:
Comfort air conditioning;
Green buildings - Keywords: High rise; China; Building; Design; Case study; Air conditioning
-
Building case study refurbishment: height of su...
- Author(s) : PEARSON A.
- Date : 2011/11
- Languages : English
- Source: CIBSE Journal - vol. 3 - n. 11
View record
-
Energy efficiency case study: quick wins.
- Author(s) : PEARSON A.
- Date : 2011/11
- Languages : English
- Source: CIBSE Journal - vol. 3 - n. 11
View record
-
Tall buildings: main feature.
- Author(s) : LOGAN S., WILLIAMS C., COWLIN F., et al.
- Date : 2002/03
- Languages : English
- Source: Build. Serv. J. - vol. 24 - n. 3
View record
-
Air-conditioning system design for the Shanghai...
- Author(s) : ZHU X., ZHAO L., SHEN B.
- Date : 2008/06
- Languages : Chinese
- Source: HV & AC - vol. 38 - n. 6
- Formats : PDF
View record
-
Energy saving research for the Terminal 2 build...
- Author(s) : LU Y., HU Y., WEI D., et al.
- Date : 2008/06
- Languages : Chinese
- Source: HV & AC - vol. 38 - n. 6
- Formats : PDF
View record