Summary
The building is a super high-rise building mainly for offices. Focusing on the energy saving, this article presents the design of the air-conditioning system, ventilating system and smoke control system, stresses the design of water system and air system of standard floors, and sums up the success and failure in the design process.
Available documents
Format PDF
Pages: 31-35, 20
Available
Public price
20 €
Member price*
15 €
* Best rate depending on membership category (see the detailed benefits of individual and corporate memberships).
Details
- Original title: [In Chinese. / En chinois.]
- Record ID : 2008-2652
- Languages: Chinese
- Subject: Environment
- Source: HV & AC - vol. 38 - n. 6
- Publication date: 2008/06
Links
See other articles in this issue (22)
See the source
Indexing
-
Themes:
Comfort air conditioning;
Green buildings - Keywords: China; Building; Ventilation; Design; Bank; Case study; Energy saving; Air conditioning
-
Energy saving research for the Terminal 2 build...
- Author(s) : LU Y., HU Y., WEI D., et al.
- Date : 2008/06
- Languages : Chinese
- Source: HV & AC - vol. 38 - n. 6
- Formats : PDF
View record
-
Air-conditioning system design for the Shanghai...
- Author(s) : ZHU X., ZHAO L., SHEN B.
- Date : 2008/06
- Languages : Chinese
- Source: HV & AC - vol. 38 - n. 6
- Formats : PDF
View record
-
HVAC system design for a large shopping mall.
- Author(s) : SHU Q., SONG J.
- Date : 2008/06
- Languages : Chinese
- Source: HV & AC - vol. 38 - n. 6
- Formats : PDF
View record
-
The HVAC component of Nedbank Phase II.
- Author(s) : STONE T.
- Date : 2011/01
- Languages : English
- Source: RACA Journal - vol. 26 - n. 11
- Formats : PDF
View record
-
Night ventilation strategy applied to intermitt...
- Author(s) : LI Z., CAO B.
- Date : 2013/07
- Languages : Chinese
- Source: HV & AC - vol. 43 - n. 279
- Formats : PDF
View record