Air conditioning design of the Beijing Bright China Chang'an Tower.

[In Chinese. / En chinois.]

Author(s) : WU Z.

Type of article: Article

Summary

The article describes the design of the air conditioning, ventilation and smoke control system of the building, composed of a national theatre and an office tower with shared heat and cold sources but separate management as required by the owner. It sums up the success and failure of the air conditioning design. The project has been working well during its two year operation.

Details

  • Original title: [In Chinese. / En chinois.]
  • Record ID : 2001-0414
  • Languages: Chinese
  • Source: HV & AC - vol. 29 - n. 129
  • Publication date: 1999/08
  • Document available for consultation in the library of the IIR headquarters only.

Links


See other articles in this issue (1)
See the source