Commissioning of air-conditioning plants: performance validation.

La mise au point des installations de génie climatique : validation des performances.

Author(s) : BLO J.

Type of article: Article

Summary

The main objectives of commissioning air-conditioning plants are to ensure quality and control at the final stage of the project. The author describes 6 steps: gathering and study of documents, study of the place, identification of the different parties which take part, operation programming, definition of the operating method, and performance validation.

Details

  • Original title: La mise au point des installations de génie climatique : validation des performances.
  • Record ID : 1994-3080
  • Languages: French
  • Subject: General information
  • Publication date: 1994/01
  • Source: Source: Chauff. Vent. Cond.
    vol. 70; n. 1; 24-25.
  • Document available for consultation in the library of the IIR headquarters only.