Commissioning of air-conditioning plants: performance validation.
La mise au point des installations de génie climatique : validation des performances.
Author(s) : BLO J.
Type of article: Article
Summary
The main objectives of commissioning air-conditioning plants are to ensure quality and control at the final stage of the project. The author describes 6 steps: gathering and study of documents, study of the place, identification of the different parties which take part, operation programming, definition of the operating method, and performance validation.
Details
- Original title: La mise au point des installations de génie climatique : validation des performances.
- Record ID : 1994-3080
- Languages: French
- Subject: General information
- Publication date: 1994/01
- Source: Source: Chauff. Vent. Cond.
vol. 70; n. 1; 24-25. - Document available for consultation in the library of the IIR headquarters only.
Indexing
- Themes: Air conditioning: general information
- Keywords: Generality; Performance; Commissioning; Testing; Equipment; Air conditioning
-
Commissioning and operation of commercial build...
- Date : 1993/03
- Languages : English
- Source: IRHACE J. - vol. 5 - n. 2
View record
-
What does the commissioning process accomplish?
- Author(s) : DORGAN C. E., DORGAN C. B.
- Date : 1999/09/19
- Languages : English
- Source: 20th International Congress of Refrigeration: Refrigeration into the Third Millennium.
- Formats : PDF
View record
-
Commissioning and fault detection of HVAC syste...
- Author(s) : GROB R. F., MADJIDI M.
- Date : 1997/08
- Languages : English
- Source: CLIMA 2000, Brussels 1997, August 30 to September 2, Congress Palace.
View record
-
Balancing ventilation systems: an annotated bib...
- Author(s) : AIVC, INIVE, LIMB M. J.
- Date : 2001
- Languages : English
View record
-
Een pleidooi voor integrated commissioning: van...
- Author(s) : LOBREGT S.
- Date : 2001/01
- Languages : Dutch
- Source: Koude & Luchtbehandeling - vol. 94 - n. 1
View record