Commissioning of air-conditioning plants: performance validation.
La mise au point des installations de génie climatique : validation des performances.
Author(s) : BLO J.
Type of article: Article
Summary
The main objectives of commissioning air-conditioning plants are to ensure quality and control at the final stage of the project. The author describes 6 steps: gathering and study of documents, study of the place, identification of the different parties which take part, operation programming, definition of the operating method, and performance validation.
Details
- Original title: La mise au point des installations de génie climatique : validation des performances.
- Record ID : 1994-3080
- Languages: French
- Subject: General information
- Publication date: 1994/01
- Source: Source: Chauff. Vent. Cond.
vol. 70; n. 1; 24-25. - Document available for consultation in the library of the IIR headquarters only.
Indexing
- Themes: Air conditioning: general information
- Keywords: Generality; Performance; Commissioning; Testing; Equipment; Air conditioning
-
Why HVAC commissioning procedures do not work i...
- Author(s) : DUBOSE G. H., ODOM J. D. III, FAIREY P. W.
- Date : 1993/12
- Languages : English
- Source: ASHRAE Journal - vol. 35 - n. 12
View record
-
Prééquiper les installations climatiques pour f...
- Author(s) : HUZE M. H.
- Date : 1994/05
- Languages : French
- Source: Promoclim - vol. 25 - n. 3
View record
-
Testing the performance of air conditioning ins...
- Author(s) : RIVA F.
- Date : 1994/09
- Languages : Italian
- Source: Install. ital. - vol. 45 - n. 9
View record
-
Building commissioning with DDC (direct digital...
- Author(s) : CHAMPAGNE D. E.
- Date : 1993/12
- Languages : English
- Source: ASHRAE Journal - vol. 35 - n. 12
View record
-
Commissioning and operation of commercial build...
- Date : 1993/03
- Languages : English
- Source: IRHACE J. - vol. 5 - n. 2
View record