Future trends in the commissioning of heating and cooling systems.
Author(s) : LOWE M.
Summary
Presents the current trends in the commissioning of heating and cooling systems used in buildings, especially problems related to the benefits of installing automatic balancing valves. Examines the problem of increased flow in poorly sized three port and two port control valves with the use of special purpose balancing valve test rigs. Includes the results of the tests carried out using the test rigs and draws conclusions.
Details
- Original title: Future trends in the commissioning of heating and cooling systems.
- Record ID : 1997-0379
- Languages: English
- Publication date: 1995/10
- Source: Source: CIBSE, Natl. Conf. Pap., Eastbourne
vol. 2; 293-301; 2 fig.; 7 tabl.
Indexing
-
Pressure drop consideration of control valves.
- Author(s) : GOLESTAN F.
- Date : 1998
- Languages : English
- Source: ASHRAE Transactions. 1998 Winter Meeting, San Francisco, CA.
View record
-
Dynamic hydronic control.
- Author(s) : EDWARDS S. K.
- Date : 1995/05/01
- Languages : English
- Source: 1995 AIRAH Conference Proceedings.
View record
-
Pumping for distribution in chilled- and hot-wa...
- Author(s) : RISHEL J. B.
- Date : 1994
- Languages : English
- Source: ASHRAE Transactions 1994.
View record
-
An air conditioning control system using variab...
- Author(s) : GREEN R. H.
- Date : 1994
- Languages : English
- Source: ASHRAE Transactions 1994.
View record
-
Innovative HVAC systems that work.
- Author(s) : LANDMAN W. J.
- Date : 1995/08/29
- Languages : English
- Source: Congresso ibero-americano de ar condicionado e refrigeraçao - Congresso brasileiro de refrigeraçao, ventilaçao e condicionamento de ar. III CIAR-V CONBRAVA. Anais./ III CIAR-V CONBRAVA. Proceedings.
View record