HOW TO INSTALL AND TEST EARTH-COUPLED HEAT PUMP SYSTEMS.

Type of article: Article

Summary

THE DESIGN AND INSTALLATION OF PLASTIC TUBING COILS FOR EARTH SOURCE HEAT PUMPS REQUIRE ATTENTION TO THE PIPE SIZE, CIRCUITRY AND THE POSSIBLE NEED TO USE ANTIFREEZE. INSTALLED COILS SHOULD BE PRESSURE TESTED, FLUSHED CLEAN AND PURGED. MARK TRENCHES AND HOLES. A.R.T.

Details

  • Original title: HOW TO INSTALL AND TEST EARTH-COUPLED HEAT PUMP SYSTEMS.
  • Record ID : 1988-2030
  • Languages: English
  • Source: Air Cond. Heat. Refrig. News - vol. 173 - n. 5
  • Publication date: 1988/02/01
  • Document available for consultation in the library of the IIR headquarters only.

Links


See the source