INSTALLING VENTILATION AT THE QUEENSLAND GOVERNMENT CHEMICAL LABORATORY.

Author(s) : JOHNSON B., GETHING G.

Type of article: Article

Summary

AIR QUALITY CONTROL WITHIN THIS FORENSIC AND INDUSTRIAL TEST BUILDING PROVIDES MAXIMUM FLEXIBILITY, SO AS TO ADAPT TO CHANGING NEEDS. MAIN SERVICES ARE LOCATED ON THE PERIPHERY, WITH EXTRA FACILITIES IN ADD-ON MODULES. PLANT IS DESIGNED FOR ECONOMY AT LOW LOADS, WHILE PROVIDING RESERVE CAPACITY IF REQUIRED. MANY DESIGN DETAILS ARE GIVEN. A.R.T.

Details

  • Original title: INSTALLING VENTILATION AT THE QUEENSLAND GOVERNMENT CHEMICAL LABORATORY.
  • Record ID : 1991-2724
  • Languages: English
  • Source: AIRAH J. - vol. 44 - n. 10
  • Publication date: 1990
  • Document available for consultation in the library of the IIR headquarters only.

Links


See other articles in this issue (3)
See the source